Posted August 17, 2026
Spotter/Laborer - Data Center Construction
Ella SA Contracting
El Paso, TX, US
Full Time
Job Description
Job Description
Position Overview:
We are seeking a dedicated and safety-conscious Spotter/Laborer to support data center construction. This role involves assisting with the installation, maintenance, and repair of essential infrastructure systems, including water, sewer, gas, and telecommunications. The ideal candidate is physically capable, detail-oriented, and committed to working safely in diverse outdoor environments.
Primary Responsibilities:
Spotter Duties
- Guide heavy equipment and truck operators during backing or tight turns.
- Maintain clear hand and eye contact with the operator at all times.
- Prevent collisions with workers, structures, or other vehicles.
- Check work areas for blind spots and ground hazards.
Site Preparation & Maintenance
- Clear work areas of debris and prepare trenches and barricades.
- Maintain a clean, organized, and hazard-free job site.
Trenching & Excavation
- Perform manual digging using hand tools and trenching equipment.
- Operate safely around heavy machinery and adhere to trench safety standards.
Utility Installation & Repair
- Assist in laying, aligning, and connecting utility pipes.
- Support repair and replacement of damaged underground systems.
Material & Equipment Handling
- Load, unload, and transport tools, materials, and equipment.
- Store materials properly to prevent damage or loss.
Safety & Compliance
- Follow all safety protocols and wear required personal protective equipment (PPE).
- Identify and report potential hazards to supervisors.
Qualifications:
Education & Experience:
-High school diploma or GED preferred.
-Previous experience in construction or utility work is a plus but not required.
Skills & Competencies:
- Ability to perform physically demanding tasks in various weather conditions.
- Familiarity with basic construction tools and equipment.
- Strong teamwork and communication skills.
- Ability to understand and follow safety procedures and job instructions.
Preferred Certifications:
- OSHA 10 or 30
- Confined Space Entry
- Traffic Control/Flagging
Physical Requirements:
- Extended periods of standing, bending, and kneeling.
- Ability to lift up to 50 pounds regularly.
- Willingness to work in noisy, dusty, and potentially hazardous environments
Work Environment:
- Outdoor job sites in varying weather conditions.
- Exposure to heavy machinery, loud noise, and hazardous materials.
Ideal Candidate Profile:
-This position is well-suited for individuals who enjoy hands-on work, thrive in team settings, and prioritize safety and quality in every task.
We are seeking a dedicated and safety-conscious Spotter/Laborer to support data center construction. This role involves assisting with the installation, maintenance, and repair of essential infrastructure systems, including water, sewer, gas, and telecommunications. The ideal candidate is physically capable, detail-oriented, and committed to working safely in diverse outdoor environments.
Primary Responsibilities:
Spotter Duties
- Guide heavy equipment and truck operators during backing or tight turns.
- Maintain clear hand and eye contact with the operator at all times.
- Prevent collisions with workers, structures, or other vehicles.
- Check work areas for blind spots and ground hazards.
Site Preparation & Maintenance
- Clear work areas of debris and prepare trenches and barricades.
- Maintain a clean, organized, and hazard-free job site.
Trenching & Excavation
- Perform manual digging using hand tools and trenching equipment.
- Operate safely around heavy machinery and adhere to trench safety standards.
Utility Installation & Repair
- Assist in laying, aligning, and connecting utility pipes.
- Support repair and replacement of damaged underground systems.
Material & Equipment Handling
- Load, unload, and transport tools, materials, and equipment.
- Store materials properly to prevent damage or loss.
Safety & Compliance
- Follow all safety protocols and wear required personal protective equipment (PPE).
- Identify and report potential hazards to supervisors.
Qualifications:
Education & Experience:
-High school diploma or GED preferred.
-Previous experience in construction or utility work is a plus but not required.
Skills & Competencies:
- Ability to perform physically demanding tasks in various weather conditions.
- Familiarity with basic construction tools and equipment.
- Strong teamwork and communication skills.
- Ability to understand and follow safety procedures and job instructions.
Preferred Certifications:
- OSHA 10 or 30
- Confined Space Entry
- Traffic Control/Flagging
Physical Requirements:
- Extended periods of standing, bending, and kneeling.
- Ability to lift up to 50 pounds regularly.
- Willingness to work in noisy, dusty, and potentially hazardous environments
Work Environment:
- Outdoor job sites in varying weather conditions.
- Exposure to heavy machinery, loud noise, and hazardous materials.
Ideal Candidate Profile:
-This position is well-suited for individuals who enjoy hands-on work, thrive in team settings, and prioritize safety and quality in every task.
Powered by JazzHR
AX6jPAt7yx
