Posted August 09, 2026
Project Manager - Industrial Controls (BMS/EPMS) | Data Center Construction
JSET Automated Technologies
Washington Court House, OH, US
Full Time
Job Description
Job Description
Project Manager – Industrial Controls (BMS/EPMS) | Data Center ConstructionPrimary Work Location: Jeffersonville, OH (Daily On-Site Required)Home Base: Columbus, OH Region | Regional Travel (up to 100-mile radius)Type: Full-time | ExemptAbout JSET Automated TechnologiesJSET Automated Technologies specializes in the installation and commissioning of Building Management Systems (BMS) and Electrical Power Monitoring Systems (EPMS). Our work is primarily focused on large-scale data center construction, where we manage controls, monitoring systems, and electrical integration from installation through final commissioning.Role Location Requirement (Please Read)This Project Manager role is specifically assigned to an active jobsite in Jeffersonville, OH.Daily on-site presence in Jeffersonville is requiredThis is not a hybrid or office-based roleA company-provided vehicle is includedJSET operates across multiple active industrial and data center construction sites throughout the region. This role requires a willingness to commute to project sites within a 100-mile radius of Columbus, OH based on project needs.Candidates must be comfortable with consistent daily travel and field-based work as a core function of the role.Upon completion of the Jeffersonville project, this role may be reassigned to support other active data center or industrial construction sites within the region.What You'll DoLead BMS and EPMS construction projects from kickoff through commissioning and turnoverManage subcontractors, general contractors, and vendors in a fast-paced industrial construction environmentDirect Low Voltage Technicians and set daily field priorities on active jobsitesCoordinate with Controls PM for L3-L5 system check out [i.e. P2P, Programming and Commissioning activities]Oversee installation and commissioning of panels, meters, gateways, and control systemsReview Contracts, Drawings, Specifications, and Schedules Of Values to ensure compliance with construction documentsManage RFIs, submittals, billing, change orders and pay applications using Procore and client systemsTrack project risks, resolve field issues, and maintain construction schedules and milestonesEnforce safety, quality, and documentation standards in data center environmentsWork EnvironmentField-based Project Manager role with daily presence on an active industrial construction siteWork performed in data centers and heavy industrial environmentsExposure to noise, dust, heat, and changing weather conditionsRegular use of Procore, project scheduling tools, and mobile devices in the fieldRequired Qualifications5+ years of experience in industrial construction or data center constructionProven experience managing project schedules, budgets, subcontractors, and client relationshipsStrong understanding of construction means and methods (electrical, mechanical, or controls)Experience with Procore, including RFIs, submittals, change orders and pay applicationsStrong Excel skills for cost tracking, reporting, and schedule of values managementAbility to lead field teams and communicate effectively with clients, engineers, and contractorsPreferred QualificationsExperience with BMS, EPMS, controls systems, or low-voltage electrical systemsFamiliarity with data center construction projectsExperience with Microsoft Project or Primavera P6Knowledge of Ethernet/IP, Modbus, or industrial communication protocolsCareer PathThis role begins with a structured onboarding and shadowing period (approximately 6 months) to ensure alignment with JSET project standards, systems, and client expectations. Following this period, Project Managers take full ownership of assigned projects.BenefitsCompetitive salary + performance-based bonus tied to project outcomesCompany-provided vehicle for project travel401(k) with company matchMedical, dental, and vision insurancePaid time off and holidaysLong-term growth opportunities in the data center and industrial construction sectorAdditional InformationApplicants must be authorized to work in the United States. Sponsorship is not available at this time.JSET Automated Technologies is an Equal Opportunity Employer.
