Skip to main content
Posted August 09, 2026

Sr. Data Center Construction Manager

Garmac Limited LLC
Rayville, LA, US Full Time
60USD - 70USD per hour

Job Description

Job Description
Sr. Data Center Construction Manager

As a Sr. Data Center Construction Manager role will be to lead largescale, complex projects and oversee all onsite construction execution—from planning through commissioning and closeout. This role requires strong field leadership, technical expertise, and the ability to manage large technician teams in fastpaced data center environments.

Location: Holly Ridge, LA
Pay: $60-$70
Key Responsibilities
  • Lead and enforce an AccidentFree Everyday safety culture.

  • Oversee daily field operations, installation strategies, and site logistics.

  • Maintain 5week lookahead schedules, labor plans, and progress tracking.

  • Ensure compliance with ANSI/TIA, BICSI, NEBS, and customer standards.

  • Lead testing/commissioning (OTDR, power meter, labeling, QA).

  • Identify design gaps and drive RFIs and scope adjustments.

  • Manage and develop large field teams (100+), union or nonunion.

  • Serve as the primary onsite liaison for the customer.

Requirements
  • 3–5+ years supervisory experience in structured cabling or data center construction.

  • Experience managing large field teams.

  • Strong knowledge of OSHA safety practices.

  • Expertise in lowvoltage, fiber, and structured cabling installations.

  • Ability to read drawings, specs, and construction schedules.

  • Proficiency with MS Office, Bluebeam, and construction platforms.

  • High School Diploma or GED required.

Preferred: Data center new build/retrofit experience, union labor experience, OSHA 30, BICSI TECH, BICSI RCDD.

Sign up for Job Alerts